Submission details
| Submission ID | 10006 |
|---|---|
| Name | David Power |
| Date | 7 April 2026 |
| Which option do you prefer? |
Option 2: Retain the current 80km/h speed limit, do not change speed limit
|
| Please tell us why? |
As a daily user of this stretch of road to commute to work I believe it should stay at 80 to help traffic flow through to the roundabout leading to the expressway. It seems absurd that the developer only pays the cost if the speed limit stays the same. There must be a crossing because of the development, so If it were to change to 60 , the developer should cover the bill to any changes on that section of road.
|
| Do you think any other physical changes are required to support the proposed speed limit change? |
I do not support the change in speed limit.
|
| How do you travel through the area? |
Drive
|
| What do you use Te Rapa Road north for? |
Travelling to/from work
|
| Are you giving feedback on behalf of an organisation? |
No, these are my own personal views
|