Additional Planning Related Charges
Service Plan Certification
Service Connection Plan Certification and Vehicle Crossing Plan Certification per hour $248.00
Trade Waste
High users are subject to individual trade waste agreements
Trade Waste Application Fees
Renewal Fee for Trade Waste Consents per application $145.00
Temporary Discharge per application $343.00
Permitted/Controlled Discharge $343.00
Conditional Consent per application $805
Hourly rate for applications per hour $145.00
Special trade waste agreements, variations or renewals. Actual costs recovered including but not limited to consultant or legal fees Actual costs
Variation / Change of Details Request for Trade waste consents (plus additional hourly rate for more than 30 minutes time noting that site inspection charges may also apply) per request $72.50
Site Inspection Fees
Conditional Consent - Site Inspection/Audit per site visit $261.00
Permitted/Controlled Discharge - Site Inspection/Audit per site visit $229.00
Site Inspection/Audit - Non Compliance per site visit $326.00
Temporary Discharge - Inspection/Audit per site visit $261.00
Quantity charge rates for Conditional Consent Holders
?g) COD (Chemical loading) per kg $0.10
a) Flow Volume per m3 $2.36
b) Suspended solids per kg $1.02
c) cBOD5 (Organic loading) per kg $0.80
d) Total Kjeldahl Nitrogen per kg $2.32
e) Total Phosphorous per kg $8.14
f) Arsenic per kg $439.71
Annual Charge
Any temporary Discharge annual fee $259.00
Conditional/Special/Tankered Discharge - Risk Class 2 annual fee $1,393.00
Conditional/Special/Tankered Discharge - Risk Class 3 annual fee $2,297.00
?Independent (Council) monitoring for consented trade waste discharges and tankered waste disposal at the Wastewater Treatment Plant (sampling and analysis) per sample collected Actual costs
Permitted/Controlled/Special/Tankered Discharge annual fee $262.00
Tankered Waste Disposal
Note:

1) Tankered waste may not be accepted at the Three Water Unit Director's sole discretion and,

2) Tankered Waste disposal to Wastewater Treatment Plant not in accordance with Trade waste Bylaw schedule 1A and 1B will require a conditional or special agreement in accordance with the Trade waste Bylaw,

3) For addresses in Hamilton City associated with an existing trade waste consent, the consent's charging provisions will supersede the tankered waste volumetric rate.
Tankered Waste disposal to Wastewater Treatment Plant in accordance with Trade waste Bylaw schedule 1A and 1B. per m3 $91.00
Tankered waste administrative charge annual fee $892.00
Enforcement and penalties
?Enforcement of Trade Waste and Wastewater Bylaw 2016 (e.g. tracing illegal discharge, cross connection remediation and clean-up, remediation of blockage) Actual costs
?Illegal discharge penalty charges As per agreement
Wastewater, Stormwater and Water
Hourly rate per hour $138.00
Wastewater, Stormwater and Water Connections
All 'by quote' work includes an overhead component of between 4-6%
Inspection fees
For work completed by an approved contactor Allows for 3 site visits $330.00
Additional inspection fee for connections undertaken by an approved contractor per hour $138.00
Inspection fees per hour $138.00
On site pipe location by quote
Reinstatement
Reinstatement of sealed roadways, footways and light vehicle entrances. by quote
Third party damages
Damage to services Actual costs
Stormwater and Wastewater connections
100mm in the Transport Corridor by quote
100mm on Private Property by quote
150mm in the Transport Corridor by quote
150mm on Private Property by quote
Water connections
Multi, 2*20 mm by quote
Multi, 3*20 mm by quote
Multi, 4*20 mm by quote
Service connection , 50mm (multi unit residential only) by quote
Single metered, 20 mm by quote
Single metered, 25 mm by quote
Single metered, 50 mm by quote
Single service connection, 20mm by quote
Single service connection, 25mm by quote
Catch pit connections
a) 300 diameter by quote
b) full size catch pit for 2 or more properties by quote
Larger Diameter Connections (>150mm) by quote
Manhole installation required by quote
Stormwater Pipes to Kerb and Channel (domestic only)
1 pipe in trench $/m per metre by quote
Modification of existing connection
Install flow restrictor by quote
Relocation of existing connection by quote
Consent to enter
Basic processing of consent to enter $368.00
Work effort required beyond initial written request to affected parties, charged for on a time cost recovery basis per hour $138.00
Private systems
Internal and external costs associated with locating, repairing and reinstatement of private water, wastewater and stormwater assets will be recovered from the owner Actual costs
Stormwater
Enforcement of Stormwater Bylaw 2021 Actual costs
Inspection of high-risk facility minimum charge $608.00
Wastewater and Stormwater Disconnection
Disconnection by quote
Water connections - additional charges
Bacteria testing per sample $397.00
Connection/disconnection application fee per hour $138.00
Connection/disconnection application fee $340.00
Customer and developer queries related to Three Waters connection feasibility and requirements per hour $240.00
Wastewater, Stormwater and Water Network Access Requests
Three waters network access request per application $123.00
Drinking water network shutdown request per application $198.00
Water and wastewater network capacity screening assessment
Consultant or specialist Actual costs
Engineering team per hour Actual costs