| Additional Planning Related Charges | ||||||||||
| Service Plan Certification | ||||||||||
| Service Connection Plan Certification and Vehicle Crossing Plan Certification | per hour | $248.00 | ||||||||
| Trade Waste | |||||||||||
| High users are subject to individual trade waste agreements | |||||||||||
| Trade Waste Application Fees | |||||||||||
| Renewal Fee for Trade Waste Consents | per application | $145.00 | |||||||||
| Temporary Discharge | per application | $343.00 | |||||||||
| Permitted/Controlled Discharge | $343.00 | |
| Conditional Consent | per application | $805 |
| Hourly rate for applications | per hour | $145.00 |
| Special trade waste agreements, variations or renewals. Actual costs recovered including but not limited to consultant or legal fees | Actual costs | |
| Variation / Change of Details Request for Trade waste consents (plus additional hourly rate for more than 30 minutes time noting that site inspection charges may also apply) | per request | $72.50 | ||||||||
| Site Inspection Fees | ||||||||||
| Conditional Consent - Site Inspection/Audit | per site visit | $261.00 | ||||||||
| Permitted/Controlled Discharge - Site Inspection/Audit | per site visit | $229.00 | ||||||||
| Site Inspection/Audit - Non Compliance | per site visit | $326.00 | ||||||||
| Temporary Discharge - Inspection/Audit | per site visit | $261.00 | ||||||||
| Quantity charge rates for Conditional Consent Holders | ||||||||||
| ?g) COD (Chemical loading) | per kg | $0.10 | ||||||||
| a) Flow Volume | per m3 | $2.36 | ||||||||
| b) Suspended solids | per kg | $1.02 | ||||||||
| c) cBOD5 (Organic loading) | per kg | $0.80 | ||||||||
| d) Total Kjeldahl Nitrogen | per kg | $2.32 | ||||||||
| e) Total Phosphorous | per kg | $8.14 | ||||||||
| f) Arsenic | per kg | $439.71 | ||||||||
| Annual Charge | |||||||||||
| Any temporary Discharge | annual fee | $259.00 | |||||||||
| Conditional/Special/Tankered Discharge - Risk Class 2 | annual fee | $1,393.00 | |||||||||
| Conditional/Special/Tankered Discharge - Risk Class 3 | annual fee | $2,297.00 | |||||||||
| ?Independent (Council) monitoring for consented trade waste discharges and tankered waste disposal at the Wastewater Treatment Plant (sampling and analysis) | per sample collected | Actual costs |
| Permitted/Controlled/Special/Tankered Discharge | annual fee | $262.00 |
| Tankered Waste Disposal | ||||||||||||
| Note: 1) Tankered waste may not be accepted at the Three Water Unit Director's sole discretion and, 2) Tankered Waste disposal to Wastewater Treatment Plant not in accordance with Trade waste Bylaw schedule 1A and 1B will require a conditional or special agreement in accordance with the Trade waste Bylaw, 3) For addresses in Hamilton City associated with an existing trade waste consent, the consent's charging provisions will supersede the tankered waste volumetric rate. | ||||||||||||
| Tankered Waste disposal to Wastewater Treatment Plant in accordance with Trade waste Bylaw schedule 1A and 1B. | per m3 | $91.00 | ||||||||||
| Tankered waste administrative charge | annual fee | $892.00 |
| Enforcement and penalties | |||||||||
| ?Enforcement of Trade Waste and Wastewater Bylaw 2016 (e.g. tracing illegal discharge, cross connection remediation and clean-up, remediation of blockage) | Actual costs | ||||||||
| ?Illegal discharge penalty charges | As per agreement | ||||||||
| Wastewater, Stormwater and Water | |||||||||
| Hourly rate | per hour | $138.00 | |||||||
| Wastewater, Stormwater and Water Connections | |||||||||||
| All 'by quote' work includes an overhead component of between 4-6% | |||||||||||
| Inspection fees | |||||||||||
| For work completed by an approved contactor | Allows for 3 site visits | $330.00 | |||||||||
| Additional inspection fee for connections undertaken by an approved contractor | per hour | $138.00 |
| Inspection fees | per hour | $138.00 |
| On site pipe location | by quote | |
| Reinstatement | ||||||||||
| Reinstatement of sealed roadways, footways and light vehicle entrances. | by quote | |||||||||
| Third party damages | ||||||||||
| Damage to services | Actual costs | |||||||||
| Stormwater and Wastewater connections | |||||||||
| 100mm in the Transport Corridor | by quote | ||||||||
| 100mm on Private Property | by quote | ||||||||
| 150mm in the Transport Corridor | by quote | ||||||||
| 150mm on Private Property | by quote | ||||||||
| Water connections | |||||||||
| Multi, 2*20 mm | by quote | ||||||||
| Multi, 3*20 mm | by quote | ||||||||
| Multi, 4*20 mm | by quote | ||||||||
| Service connection , 50mm (multi unit residential only) | by quote | ||||||||
| Single metered, 20 mm | by quote | ||||||||
| Single metered, 25 mm | by quote | ||||||||
| Single metered, 50 mm | by quote | ||||||||
| Single service connection, 20mm | by quote | ||||||||
| Single service connection, 25mm | by quote | ||||||||
| Catch pit connections | |||||||||
| a) 300 diameter | by quote | ||||||||
| b) full size catch pit for 2 or more properties | by quote | ||||||||
| Larger Diameter Connections (>150mm) | by quote | ||||||||
| Manhole installation required | by quote | ||||||||
| Stormwater Pipes to Kerb and Channel (domestic only) | ||||||||||
| 1 pipe in trench $/m | per metre | by quote | ||||||||
| Modification of existing connection | |||||||||
| Install flow restrictor | by quote | ||||||||
| Relocation of existing connection | by quote | ||||||||
| Consent to enter | |||||||||
| Basic processing of consent to enter | $368.00 | ||||||||
| Work effort required beyond initial written request to affected parties, charged for on a time cost recovery basis | per hour | $138.00 | ||||||||
| Private systems | ||||||||||
| Internal and external costs associated with locating, repairing and reinstatement of private water, wastewater and stormwater assets will be recovered from the owner | Actual costs | |||||||||
| Stormwater | ||||||||||
| Enforcement of Stormwater Bylaw 2021 | Actual costs | |||||||||
| Inspection of high-risk facility | minimum charge | $608.00 | ||||||||
| Wastewater and Stormwater Disconnection | ||||||||||
| Disconnection | by quote | |||||||||
| Water connections - additional charges | ||||||||||
| Bacteria testing | per sample | $397.00 | ||||||||
| Connection/disconnection application fee | per hour | $138.00 | ||||||||
| Connection/disconnection application fee | $340.00 | ||||||||
| Customer and developer queries related to Three Waters connection feasibility and requirements | per hour | $240.00 | |||||||
| Wastewater, Stormwater and Water Network Access Requests | |||||||||
| Three waters network access request | per application | $123.00 | |||||||
| Drinking water network shutdown request | per application | $198.00 | |||||||
| Water and wastewater network capacity screening assessment | |||||||
| Consultant or specialist | Actual costs | ||||||
| Engineering team | per hour | Actual costs |
Feedback